Click here to Skip to main content
16,014,882 members
Articles / Programming Languages / Visual Basic
Article

Gantt Chart

Rate me:
Please Sign up or sign in to vote.
4.75/5 (80 votes)
2 Oct 2008CPOL2 min read 619K   38.3K   254   171
Adds an easy to use Gantt chart to your application.

GanttChart.JPG

Introduction

This component makes it easy to add a Gantt chart to your application. You just need three lines of code to get it working.

This Gantt chart control includes these features:

  • The columns are automatically shown based on the width of the component and the time between the start date and the end date. If there're more than two days between those dates, it will only show the date; otherwise, it will show the time of the day (with minimum 5 minutes apart).
  • You can set the color (including the hover color) for each bar individually.
  • The Gantt chart automatically shows a custom scroll bar when it contains more rows than the visible area allows.
  • You can easily obtain information about the bar when hovering your mouse above one.
  • An easy to use multi-row tooltip text.
  • Change bars using your mouse.

Background

I tried to find a good, free, and easy Gantt chart control to use in my project, but didn't have any luck. Then, I decided to make one myself, which actually was easier than I thought it would be.

Using the code

To get the Gantt chart component to show something, you only need this:

VB
GanttChart1.FromDate = New Date(2007, 12, 12, 0, 0, 0)
GanttChart1.ToDate = New Date(2007, 12, 24, 0, 0, 0)
GanttChart1.AddChartBar("Row 1", Nothing, New Date(2007, 12, 12), 
    New Date(2007, 12, 16), Color.Aqua, Color.Khaki, 0))

As mentioned above, this component also includes a multi-line tooltip text.

VB
With GanttChart2
  Dim toolTipText As New List(Of String)
  toolTipText.Add("Time:")

  .ToolTipTextTitle = .MouseOverRowText
  .ToolTipText = toolTipText
 
End With

When a tooltip-text-row is included, the line is automatically bolded.

It is also possible to save the Gantt Chart to an image file:

VB
GanttChart2.SaveImage("C:\TestImage.jpg")

The included Zip file contains a project showing how to use its different features.

History

  • Version 0.55
    • Added the feature to drag the bars (after editing a bar, a BarChanged event is fired).
    • If time between start and end date is larger than 60 days, the Gantt chart switches over to showing months instead of days.
  • Version 0.54
    • The Gantt chart can now be saved to an image file.
  • Version 0.53
    • ScrollBar added to component.

License

This article, along with any associated source code and files, is licensed under The Code Project Open License (CPOL)


Written By
Denmark Denmark
This member has not yet provided a Biography. Assume it's interesting and varied, and probably something to do with programming.

Comments and Discussions

 
QuestionHow do I add this control to my project? Pin
Tater_Schroeder19-Jan-16 2:28
Tater_Schroeder19-Jan-16 2:28 
AnswerRe: How do I add this control to my project? Pin
chrisbray9-Jun-16 3:17
chrisbray9-Jun-16 3:17 
Questiongantt chart in c# Pin
rajbir singh thind5-Jul-15 23:33
rajbir singh thind5-Jul-15 23:33 
QuestionPl ive me a hint on how to make it to work for 59 seconds or less ! Pin
Renganathan Iyengar30-Apr-15 1:37
professionalRenganathan Iyengar30-Apr-15 1:37 
QuestionHorizontal Scroll Bar Pin
gabriele_greco7-Apr-15 23:29
gabriele_greco7-Apr-15 23:29 
QuestionHorizontal scroll bar to Gantt Chart Pin
salman ansari2-Mar-15 19:48
salman ansari2-Mar-15 19:48 
GeneralMy vote of 5 Pin
AAL87-Nov-14 10:44
AAL87-Nov-14 10:44 
SuggestionUpgrade for rectangle bars Pin
Knight school30-Oct-14 4:27
Knight school30-Oct-14 4:27 
I have been playing with this for a while. I think this is great (Some limitations, but with everyones help it could be a good tool. So here is my change. I hope you like it.

Change (In DrawBars)
VB
grfx.FillRectangle(obBrush, obRect)
  grfx.DrawRectangle(Pens.Black, obRect)


To
VB
Dim Radius As Integer = d / 2 ' Change size to suit
 Dim gp As GraphicsPath = New GraphicsPath()

If c <= 0 Then
                   Else

                       If c < Radius * 2 Then
                           If c < Radius Then
                               gp.AddLine(a, b, (a + c), b) 'Top Line
                              
                               gp.AddLine(a + c, b, a + c, (b + d)) 'Line right down
                              
                               gp.AddLine((a + c), b + d, a, b + d) 'bottom line
                              
                               gp.AddLine(a, (b + d), a, b) 'line left
                              
                               gp.CloseFigure()
                           Else
                               gp.AddLine(a, b, (a + c) - Radius, b) 'Top Line
                               gp.AddArc((a + c) - Radius, b, Radius, Radius, 270, 90) 'Arc top right
                               gp.AddLine(a + c, b + Radius, a + c, (b + d) - Radius) 'Line right down
                               gp.AddArc((a + c) - Radius, (b + d) - Radius, Radius, Radius, 0, 90) 'bottom right bottom arc
                               gp.AddLine((a + c) - Radius, b + d, a, b + d) 'bottom line
                             
                               gp.AddLine(a, (b + d) - Radius, a, b) 'line left
                              
                               gp.CloseFigure()
                           End If
                       Else


                           gp.AddLine(a + Radius, b, (a + c) - Radius, b) 'Top Line
                           gp.AddArc((a + c) - Radius, b, Radius, Radius, 270, 90) 'Arc top right
                           gp.AddLine(a + c, b + Radius, a + c, (b + d) - Radius) 'Line right down
                           gp.AddArc((a + c) - Radius, (b + d) - Radius, Radius, Radius, 0, 90) 'bottom right bottom arc
                           gp.AddLine((a + c) - Radius, b + d, a + Radius, b + d) 'bottom line
                           gp.AddArc(a, (b + d) - Radius, Radius, Radius, 90, 90) 'Arc bottom left
                           gp.AddLine(a, (b + d) - Radius, a, b + Radius) 'line left
                           gp.AddArc(a, b, Radius, Radius, 180, 90) 'Arc top left

                           gp.CloseFigure()
                       End If
                   End If

grfx.SmoothingMode = SmoothingMode.AntiAlias 'Can be changed to high quality but could be time zapper

                grfx.FillPath(obBrush, gp)
                grfx.DrawPath(obPen, gp)

QuestionI am getting an error that the control is missing. Pin
Arun KrishnaMoorthy16-Sep-14 21:02
Arun KrishnaMoorthy16-Sep-14 21:02 
QuestionASP.Net Version of it ?? Pin
benaref24-May-14 23:21
benaref24-May-14 23:21 
QuestionC# Version Webforms Pin
Flavio Renato19-Nov-13 1:23
Flavio Renato19-Nov-13 1:23 
AnswerRe: C# Version Webforms Pin
Ingve Moss Liknes21-Mar-14 23:01
Ingve Moss Liknes21-Mar-14 23:01 
GeneralRe: C# Version Webforms Pin
Member 109619107-Aug-14 20:34
Member 109619107-Aug-14 20:34 
Questionhow to add waiting Cursors in your lib Pin
Member 87300737-May-13 16:54
Member 87300737-May-13 16:54 
AnswerHow To Add Text to Bars Pin
Famous Mortimer15-Apr-13 9:50
Famous Mortimer15-Apr-13 9:50 
QuestionHow to control the column text (need to change the moth to days) Pin
Member 982388314-Apr-13 19:33
Member 982388314-Apr-13 19:33 
AnswerRe: How to control the column text (need to change the moth to days) Pin
Adagio.8117-Apr-13 0:50
Adagio.8117-Apr-13 0:50 
GeneralMy vote of 5 Pin
doktor0_929-Jan-13 9:23
doktor0_929-Jan-13 9:23 
GeneralRe: My vote of 5 Pin
Adagio.8129-Jan-13 20:52
Adagio.8129-Jan-13 20:52 
QuestionSpeed improvement ?! Pin
PSoft200014-Nov-12 3:54
PSoft200014-Nov-12 3:54 
QuestionText on Bars Pin
Mish.me3-Nov-12 10:01
Mish.me3-Nov-12 10:01 
AnswerRe: Text on Bars Pin
fk_nirvana25-Jun-13 10:52
fk_nirvana25-Jun-13 10:52 
QuestionHow to change line height for bars ? Pin
mjfuchs4-Oct-12 1:39
mjfuchs4-Oct-12 1:39 
AnswerRe: How to change line height for bars ? Pin
Mish.me3-Nov-12 10:12
Mish.me3-Nov-12 10:12 
Question1 Question and 1 Error Pin
mjfuchs2-Oct-12 2:06
mjfuchs2-Oct-12 2:06 

General General    News News    Suggestion Suggestion    Question Question    Bug Bug    Answer Answer    Joke Joke    Praise Praise    Rant Rant    Admin Admin   

Use Ctrl+Left/Right to switch messages, Ctrl+Up/Down to switch threads, Ctrl+Shift+Left/Right to switch pages.